Brandon Town Hall
Brandon, Vermont
2004
Liszt Historical Restoration designed and completed shop drawings and extensive specifications for Brandon Town Hall. We are honored to have developed a close team effort with Gawette Marble out of Rutland, VT with this project.
Tasks and details included:
• Demolition of old concrete stairs
• Cut and grind of original granite portico floor stones to receive new treads
• Care and consideration for massive brick columns resting on decking
• Stainless steel fasteners were designed and installed by Paul List
• Designed and installed the stainless steel fasteners system to anchor the marble work to the stringers
(This was not in original bid specifications)
|